'

Hongyi—Analysis of Cases of Changing Doors for Transit

□The situation at that time:

A county middle school in Shanwei, Guangdong, with more than 2,800 students and 160 faculty members, covers an area of ​​more than 20,000 square meters, and has a history of 60 years. The school gate is close to the street, and the height difference between the campus floor and the street floor is as much as two meters. The school gate is less than 3 meters wide, and vehicles cannot enter the school. It is extremely unsafe for students to go to and from school. There have been many dangerous accidents. Moreover, the campus wall is tall and closed, and there are stores and toilets along the street on both sides of the school gate .

□Bad analysis:

No matter from the analysis of safety, landscape, practicality, etc., its Feng Shui layout is extremely poor:

1. The steep slope in front of the door makes the door guilty of road evil;

2. The wall is closed and the air is heavy (land and water is evil);

3. The direction of the school gate is not in accordance with the principles of the landscape.

□Processing method:

1. Demolition of fences, old school gates and street buildings;

2. Stand the school gate 8 meters back, the gate is 8 meters wide, the small door is 2 meters, and the total width exceeds 10 meters;

3. A platform with a width of 6 meters is set up in front of the school gate to make it easy for various vehicles to enter and exit;

4. A 6-meter-wide road on the south of the school gate extends 50 meters, and the lead road on the north extends 30 meters;

5. The school gate is a gatepost design with no beam frame;

6. The permeable design of the surrounding wall matches the beautification of the street to form a streetscape.

□Current status:

One year since the reconstruction

1. No dangerous accident;

2. Health of teachers and students;

3. The school spirit and discipline have improved significantly;

4. The enrollment rate increased by 30% that year.