Why do houses need to be built from the inside out

According to Feng Shui, when building a house, people should first lay the foundation, complete the house, and then configure the other houses, and the door and other work outside the house should be finished as a good thing.

It would be unsatisfactory to start building a house from the outside to the inside, and finish the exterior works first, and then carry out the work inside the house. Because this will trap the pollution and foul air generated during the construction process in the house, which will make the house breath unsmooth and affect the daily life of the homeowner.

In practice, the construction of a house should also be from the inside out, which is like wearing clothes, you should wear underwear first and then outer clothes. In the implementation of residential construction, if you do the outdoor work first, and then the internal construction, there may be a danger of staining the completed part when moving materials.

In any case, the working procedures for building residential buildings must be drawn up in advance from the inside out. This is necessary, and it is even more important today when wages are expensive. Even to build a wooden house, many workers of the same type are needed. In case the construction plan is not completed, the construction procedure is improper, and the construction time is delayed, the more money will be paid.

The following is a description of the construction procedures for residential buildings:

1. Foundation project: This project is the foundation part of the building, most of which are operated underground, so the stability of the foundation project is related to the safety of the entire house, so special attention should be paid to it. In the case of wooden houses, the concrete foundation works must be at least 30 cm thick underground and 20-30 cm thick above ground. Otherwise, the house may collapse due to the weak foundation in the future .

2. Shaft engineering: the combined work of residential frameworks such as column frame beams.

3. Bed engineering: skeleton plane work after completion of axis engineering.

4. Hut project: the fortification of the roof part.

5. Fabrication engineering: the general term for interior and exterior decoration operations.

6. Equipment engineering: electrical wiring, plumbing, water supply and drainage, etc.

7. Furniture engineering: such as fortifications such as closet, quilt cupboard or interior decoration.

8. Exterior structure and garden engineering: work such as door, fence and garden tree planting.

The above is the working procedure for building residential buildings. If you can follow this procedure and step by step, you can not only reduce the repetitive work of different natures and make the project be completed as soon as possible, but also save a lot of costs in terms of economy.

As a kind of space for existence, the house is a place for human beings to replenish their energy. People stand because of the house, and the house exists because of the people, and the people and the houses are connected, and they are connected to the world. Therefore, when building a house, we must use a dialectical point of view, and build it in an orderly manner from the inside out.